License Preparation NepalNEC CIVILGitBook practice — Set 10 (Chaitra, 2081)
Full marks: 100 · Questions: 80
01Question bank
02Question bank
03Question bank
AHigher than really they are
BLower than really they are
04Question bank
05Question bank
06Question bank
07Question bank
08Question bank
09Question bank
AK0=1−sinϕ BK0=sinϕ CK0=1−cosϕ DK0=1+sinϕ 10Question bank
AForces between the soil particle and High water content
BAction of gravitational force
11Question bank
ATotal pressure at base of the footing
BExcess pressure after the construction of the structure
CMinimum pressure intensity at the base
12Question bank
ATo transfer load of an isolated column
BDistance between the columns are long
CTwo column loads are unequal
13Question bank
Cfirst increases then decreases
Dfirst decreases then increases
14Question bank
AStudy of fluid behaviour at rest
BStudy of fluid behaviour in motion
CStudy of fluid behaviour at rest and in motion
DStudy of fluid behaviour at rest and in motion
15Question bank
16Question bank
BWithin a cylindrical depth
17Question bank
APrinciple of balancing of momentum
CPrinciple of conservation of energy
18Question bank
19Question bank
20Question bank
21Question bank
Dcombination of sedimentation and digestion tank
22Question bank
23Question bank
24Question bank
25Question bank
26Question bank
Aassures economical water distribution
Breduces possibility of breaching
Cincreases available head for power generation
27Question bank
Asilt grade in the channel is variable
Bdischarge in the channel is variable
Csilt charge in the channel is variable
Dchannel flows in unlimited, incoherent alluvium of the same character as that transported material.
28Question bank
AKhosla's method of independent variables
CElectrical analogy method
29Question bank
BSeepage from unlined canals
DExcessive tapping of groundwater
30Question bank
AIt doesn't take into consideration precipitation lost through deep percolation
BIt satisfies evapotranspiration needs of the crop
CIt includes surface runoff loss
DIt doesn't include surface runoff water loss
31Question bank
32Question bank
AMarginal cost and benefit approach
BInstalled capacity optimization approach
33Question bank
34Question bank
AUSBR Stilling Basin Type I
BUSBR Stilling Basin Type II
CUSBR Stilling Basin Type III
DUSBR Stilling Basin Type IV
35Question bank
AExternal pressure is more than internal pressure
BSubjected to high internal pressure
36Question bank
CMixed and changing ground
37Question bank
38Question bank
A60 percentile cumulative frequency
B75 percentile cumulative frequency
C80 percentile cumulative frequency
D85 percentile cumulative frequency
39Question bank
40Question bank
Balong the re-entrant curves
41Question bank
42Question bank
43Question bank
44Question bank
45Question bank
APass through the centroid of the section
BBe equidistant from the top and bottom films
CBe an axis of symmetry of the section
46Question bank
AE=3K+G9KG BG=3E+G9KE CE=K+3G9KG DK=3G+E9EG 47Question bank
48Question bank
49Question bank
Amaximum stress produced by the eccentric load
50Question bank
51Question bank
52Question bank
Adepth of neutral axis decreases
Bdepth of neutral axis increases
53Question bank
54Question bank
A2200kg/m3 B2500kg/m3 C2800kg/m3 D2100kg/m3 55Question bank
56Question bank
57Question bank
58Question bank
59Question bank
Bline and staff organization
60Question bank
61Question bank
62Question bank
63Question bank
Ctraffic density \* traffic speed
64Question bank
A1525(L+4.3)−14.7L2 B1525(L+7.3)−14.7L2 C1525(L+6.3)−14.7L2 D1526(L+8.3)−14.7L2 65Question bank
AThe first disbursement occurs at the end of year 2
Bthe first receipt occurs at the end of year 1
Cthe second receipt occurs at the end of year 3
66Question bank
67Question bank
A150 cm, 1150 hectares/cumec
B180 cm, 1825 hectares/cumec
C200 cm, 1728 hectares/cumec
D195 cm, 1920 hectares/cumec
68Question bank
69Question bank
70Question bank
71Question bank
A21 of the thickness of thicker part B27 of the thickness of thinner part C23 of the thickness of thicker part D43 of the thickness of thinner part 72Question bank
73Question bank
74Question bank
75Question bank
76Question bank
A(V1−V2)/(V1) B(V12−V22)/(V12) C(V12)/(V12−V22) D(V1)/(V1−V2) 77Question bank
78Question bank
79Question bank
Ak0=1−μμ Bk0=1+μμ Ck0=1−μ2μ Dk0=1−μ1 80Question bank
B(Crash Cost - Normal cost)/ (Normal time - Crash time)
D(Normal cost - Crash cost)/ (Normal time - Crash time)