NEC Civil · 2081 · Question 60

Two turbo-generators, each of capacity 25,000 kW, have been installed at a hydel power station. The load on the hydel plant varies from 15,000 kW to 40,000 kW. The total installed plant capacity and the load factor are nearly:

GitBook practice — Set 6 (Ashoj, 2081)

A40,000 kW and 68.8%
B50,000 kW and 68.8%
C40,000 kW and 62.3%
D50,000 kW and 62.3%